Project Summary:
Employer: Khuzestan Water and Power Authority
Consultant: Mahab Ghodss Consulting Engineer
Contract Duration: 45 months and start date of the project: July 1987
Project technical information:
Dam type: Rockfill with clay core
The volume of the embankment of the body: 9 million cubic meters
Dam height: 175 meters from foundation
Concrete volume: 180,000 cubic meters
Dam reservoir volume: 1.25 billion cubic meters
Type of spillway: Gated shoot
Total length of galleries and tunnels: 6000 meters
The total length of the water right diaphragm is 167 meters