Projects >
Tuesday 23 April 2024
This project includes the construction of water supply tunnels, vertical shafts of gates control , and the power plant's tail water canal as well as the bridge between the dam and the control room. It is part of the large project of Karkheh reservoir dam in Khuzestan province.
Water supply tunnels and tail water canal

Project information:

Total concrete volume: 100,000 m3

Tail water canal length: 260 meters

Number of water supply tunnels: 3 lines

length of all water supply tunnels : 1,350 meters

Diameter of water supply tunnels: 5/5 meters

Total length of the vertical shafts of control: 5/187 (5/62 x 3)


Publish Date: 09 June 2018 - 15:01
Send to friend