Project
work includes tunnel construction, syphon, canal and division structures,
underpasses, and so on.
Project
information
Tunnel
length: 1700 meters (5 pieces)
Syphon:
700 meters (3 pieces)
Canal:
300 meters
Open
drilling volume: 150,000 cubic meters
Tunnel
drilling volume: 40,000 cubic meters
excavation
volume: 10,000 cubic meters
Concrete
volume: 28,000 cubic meters