The Purpose of this dam is production of hydro-electric energy, increasing the life cycle of downstream dams, decrease in the flood control cost of khersan-II dam.
This project started in Sep 2018.
Project Information:
Dam Type:			Concrete double arch
Dam height:			195 m
Crest Length:		        470 m
Crest width:			6 m
Spillway:			        Free shoot on the dam body and side spillway 
Spillway Capacity:		6300 m3/s
Diversion System:		a tunnel 756 m long, with a dia. of 12.5 m, and a cofferdam made of soil-cement with height of 44 m.
Reservoir Capacity:	1.15 billion m3
Rock excavation:		530.000 m3
Concrete casting:		1.1 million m3